Land
Producing leases and pad infrastructure — the foundation every other layer sits on.
Land · Power · Fiber · Then AI
Acreage and well gas first. Power and fiber next. Then Bitcoin mining and AI-ready technology energy campuses — with midstream and connectivity status stated plainly.
The stack
Texoil Ventures sequences the field: control the land, power it behind the meter, connect with fiber, then run AI and mining loads on technology energy campuses.
Producing leases and pad infrastructure — the foundation every other layer sits on.
Behind-the-meter gas and generation options sized to lease supply — Existing, Engineered, or Conceptual as labeled.
AT&T-validated 400 Gbps dedicated fiber at Atlas 1, Atlas 2, and Atlas 3 — so AI and mining can live at the well.
Bitcoin mining and AI-ready technology energy campuses on well gas — the productive end of the stack.
Field midstream
Status is mixed: some elements exist in the field; commercial frameworks may still be planning-level.
Meter presence at the 4H location supports takeaway optionality for lease gas.
Commercial framework on file for an approximately 16-mile Enterprise compressor lateral. Terms are planning-level and not all definitive — not represented here as fully executed takeaway.
Connectivity
In Process
AT&T has validated 400 Gbps dedicated fiber capacity at Atlas 1, Atlas 2, and Atlas 3. That underpins operational communications and campus connectivity across the Ventures footprint.
POWERING THE FUTURE.